The scenery build budget was approximately $2,000, and the build time was four weeks. No stock units were used in the construction. The construction crew was composed of ten undergraduate students and the Technical Director. All painting was completed by students.
Representative Drafting Produced in Macromedia Freehand, Version 5 and reduced in scale from the original 24" X 36" Plates.
A complete set of high resolution production photos and production drafting has been archived on CD-ROM in an image database and is available upon request.
For Details of the Theatre Space, Please refer to: The HJT Tour